Site template
Alcove
A contract furniture enquiry website template with 22 page templates, 73 demo content items and 68 photographs. Pieces from the catalogue are collected into a single enquiry list.
What is included
One payment, free updates for life. The AumCreate theme and Aumframe editor are included; free WordPress.org dependencies are listed separately below.
The template itself
22 page templates, 73 demo content items and 68 images, imported together.
The WordPress theme used by the template. Included with the purchase, with free updates.
The visual editor used to build the pages and to keep editing them after launch.
Required by this template and included with it.
It also requires AumViso, available free on WordPress.org and installed from the WordPress dashboard.
Pay with PayPal or Alipay. The purchase becomes available in your account after payment is confirmed.
Installation and launch service · $399 →
About this template
Each piece lists a model code, dimensions, lead time, minimum order quantity and price band, and can be added to an enquiry list that the visitor submits as one request. Project pages list the pieces supplied line by line, and each piece page lists the projects it has been used in. Finishes form a second index across the catalogue, with a page for each finish, so specifiers can browse by material as well as by product. The site has no cart or checkout; all requests are submitted through the enquiry list.
Setup process
All templates follow the same installation and import process before the demo content is replaced.
- 01
Install the theme and the editor
Download the current packages from your account page, upload them to WordPress, and activate them. A short video covers the steps.
- 02
Import the template
The import package creates the included pages, demo content, and supported settings together.
- 03
Replace the demo content
Replace the demo text, media, products, and business-specific settings with the final content required for launch.
Pages and layouts included
Standard pages, listing and detail layouts, search results, a 404 page, and the shared site shell.
Pages
- Home
- Your enquiry
- Finishes
- The workshop
- Contact
- Legal pages
Listing pages
- Collections / one collection
- Finish
- Projects
- Journal / category archive
- Guides
- Glossary
- FAQs
- Any other index
Detail pages
- Piece
- Project
- Journal entry
- Guide
- Any other single
Search
- Search results
404
- Not found
Header & footer
- Site shell
Inside the template




System requirements
The requirements below use the highest minimum requirement among the template and its required components.
- WordPress
- 6.0+
- PHP
- 8.0+
- Database
- MySQL 5.7+ / MariaDB 10.4+
- PHP memory
- 128 MB
Memory and database figures are the WordPress baseline, not a measurement of this template.
Installed components
Components running on the site after import, with current package versions.
- Alcove Contract1.0.6From us
- AumCreate2.28.6From us
- Aumframe1.32.1From us
- AumNexCart1.4.2From us
- AumVisoWordPress.org
Release history
1.0.5
2026-09-25
Multilingual: the kit now specifies to AumLang which custom content types and taxonomies are translated. Previously only posts and pages were translated. Requires theme 2.0.76 or later.
1.0.2
2026-09-24
First release.
Licence
One domain, subdomains included
Updates
Free updates for life
Support
Email support for installation and product issues
Refunds
Handled under the Terms
Included foundation
Shared template foundation
These capabilities are provided by the shared AumCreate theme and Aumframe editor. Template-specific dependencies are listed separately on each product page.
Design
- Visual editor
- Motion controls
- Editable header and footer
- Light and dark palettes
- Theme-aware initial rendering
Content
- Multiple article layouts
- Automatic video cover generation
- In-place list interactions
- Search by content type
- Member interaction features
Operation
- Importable site package
- WooCommerce layout integration
- Performance-related settings
- Consent-based script loading
- Custom login layout
Specifications
- Industry
- Contract furniture
- Site type
- Enquiry site
- Page templates
- 22
- Demo content
- 73
- Images
- 68
- Requires
- AumCreate + Aumframe + AumNexCart + AumViso
Pre-purchase questions
- Can I edit the template after import?
- Yes. The Aumframe editor remains installed, so supported layouts, content, site-shell elements, and design settings can continue to be edited.
- How many sites can I use it on?
- Each purchase is licensed for one domain, including its subdomains. The domain may be your own or a client’s. Moving the licence to a different domain is done on request.
- Does the template require renewal?
- No. The template does not require a recurring renewal or an active AumCreate subscription to remain installed and usable. Updates are free for life.
- How long does setup take?
- Installation and import are guided steps. Completion time depends on the hosting environment, site configuration, and the amount of demo content being replaced.
- Can I publish the demo images?
- Yes. The images are AI-generated and may be used on the published site. Replacing them with your own photography is recommended.
- Can I get a refund?
- Digital purchases are normally final after delivery. If the template does not work, does not match the product description, or you were charged twice, contact support@aumcreate.com. See the Terms for the full policy; statutory rights are unaffected.
Other templates
Straitline Laser
Enquiry site
For job shops and contract manufacturers that quote each order from a drawing, a material and a quantity.
Ardesa Surfaces
Corporate site
For manufacturers and suppliers of materials or product ranges sold by specification through architects and specifiers.
Tindermoor & Co.
Enquiry site
For wholesalers with a large catalogue and trade customers who buy on account terms, where orders begin with an enquiry.




